9 November 2000
NSCC ACTION LETTER 5-00
1. Purpose. To provide
guidelines, and review forms and worksheets for the 2000 NSCC/NLCC Annual Inspection and
Evaluation Report as required by reference (b).
2. Discussion. Reference (b) was distributed
to all units, Regional/Associate Regional Directors, and Headquarters Representatives in February
of this year. This one-time mass distribution of this report was done early in the year to
ensure Regional Directors, unit commanding officers and members of the area inspection
teams had ample time to familiarize themselves with the contents of this document. if you
have not reviewed the report, now would be a good time to "dust-off' the report and
become fiuniliar with its contents. Unit commanding officers are encouraged to conduct a
pre-inspection during the last quarter of the year.
3. Action.
- Inspection Cycle. The inspection cycle is
from 1 January through 31 December 2000.
- Inspection Schedule. Regional Directors have
overall responsibility for scheduling, coordination, conducting and/or reviewing unit
inspections for NSCC/NLCC units under their cognizance. Where compatible with the regional
schedule, inspection teams will inspect NLCC Training Ships with their affiliate NSCC
units. Designation of Associate Regional Directors to inspect NLCC Training Ships is also
appropriate. ALL inspections will be scheduled between 1 January
and 31 March. Regional Directors are responsible for submitting completed
inspection reports to NHQ. The completed report must arrive at NHQ no later
that 30 April 2001. Unit commanding officers should constantly monitor the
status of their inspection/evaluation reports to further ensure they arrive at NHQ on
time.
- Inspection Teams. Regional Directors will
designate inspection team members per reference (a). When possible, the same inspection
team(s) should be used throughout the Directors region to provide consistency. Active
duty, reserve, retired and Navy League officials may only participate as members for
personnel inspections. When this procedure is used, the NSCC regional inspection team
shall conduct the remaining sections of the inspection to ensure fairness in grading. Units
not inspected by a regional designated inspection team will not be eligible to compete for
national awards. In preparing the inspection/evaluation report, inspection team
members must observe the following:
- Inspection team members must review and comply with Part 1 Senior
Inspecting Officer Guide of reference (b).
- No more than 25 NSCC service records and/or 15 NLCC service records
need to be inspected for Section B of Part III of the NSCC/NLCC Annual
Inspection/Evaluation Report.
- NSCC and NLCC scores will not be combined in
arriving at inspection scores.
- NSCC units with affiliate NLCC training ships that have the same
officer staff will prepare a separate report for each. NLCC cadet scores will not be used
in arriving at the final score for the NSCC unit.
- Regional Directors and Unit Commanding Officers will receive a list
from NHQ of the unit attendee's at summer training and a list of the unit's participation
in 5 day or more local training towards the end of the year.
- Those NLCC companies with less than five (5) cadets on board need
not he formally inspected. However, a personnel inspection and a courtesy review
of the records will be completed. Comment to be included under Part IV of the NSCC/NLCC
Annual Inspection/Evaluation Report. NLCC companies with five or more cadets shall be
inspected utilizing the inspection/evaluation report and the results forwarded to NHQ.
NLCC companies are not eligible to compete for national standings.
- Unit Inspection Procedures. Each unit is in
receipt of reference (b). Inspections will be conducted IAW the procedures outlined in
this report. In preparing for the annual inspection and preparing the report, unit
commanding officers and inspection team members must observe the following:
- Unit commanding officers must review and comply with the "Unit
Commanding Officer Instructions" in reference (b).
- Use Part II of reference (b) for NSCC units and Part III of reference
(b) for NLCC training ships and companies.
4. Distribution of Annual Inspection/Evaluation Report.
Upon completion of the inspection the Senior Inspection Officer (SIO) will forward the
report to the Regional Director for comments in Part VI. If the SIO is the Regional
Director this step is not necessary. After the Regional Director has completed and signed
the report the following distribution should be made:
- Make one (1) copy and forward to NHQ for processing. This is intended
to prevent a unit from being penalized for failure to meet the 30 April
deadline. The signature of the Committee Chairperson while desired is not
required for NHQ to process the report. If the Committee Chairperson is readily
available this step will not be necessary.
- Forward the report to the NSCC Committee Chairperson for review,
comments and endorsement. The signature of the council president is acceptable. The
council shall return the report to NHQ with the completed Audit Report.
The Audit Report must be completed in order for the unit to be eligible for National
Awards. If the sponsoring organization does not provide monetary support to the unit,
the Audit Report should be annotated appropriately and forwarded with the Inspection
Report. The Regional Director shall make all attempts to ensure the report is forwarded to
NHQ prior to the deadline.
| NOTE: |
1) DO NOT
return the officer and cadet worksheets to NHQ. They are to be retained at the unit.
2) Unit commanding officers are encouraged to
assist the Regional Director to ensure their report is received at NHQ no later than the
deadline. |
5. National Competition. NHQ determines national ranking on the
basis of final grades and cadet enrollments for each unit. The following minimum
requirements must be met to be eligible:
- NSCC units must have a minimum of 25 cadets
enrolled by 31 December 2000.
- NLCC units must have a minimum of 15 cadets
enrolled by 31 December 2000.
- The report must arrive at NHQ on or before 30 April 2000.
Due to summer training workload, reports submitted after 30 April will be recorded as time
permits and will not be considered for national competition.
- The NSC-11
Budget/Audit Report must accompany the
Inspection/Evaluation Report. This report is absolutely required
whether or not the unit is eligible for national competition.
NOTE: NLCC companies are not eligible for National
Awards.
6. Cancellation. This action letter will be
cancelled on 1 June 2001.

M.D. FORD |
Distribution:
National Chairman
National President
NSCC Committee Chairman
Headquarters Representatives
Regional/Associate Regional Directors
NSCC/NLCC Unit Commanding Officers
|