 7 November 1997
NSCC ACTION LETTER 12-97
1. Purpose. To provide the
guidelines, forms and worksheets for the 1997 NSCC/NLCC Annual Inspection/Evaluation as
required by reference (a).
2. Discussion. Enclosure (1) as used last
year. It should be used as a management tool throughout the year to further enhance the
administration of NSCC/NLCC units. Regional directors, unit commanding officers and
members of the inspection team are to familiarize themselves with the contents of
enclosures (1) through (4) prior to conducting the inspection. Unit commanding officers
are encouraged to conduct a pre-inspection during the last calendar quarter of the year.
NHQ will provide each unit with an evaluation grade for Part VII of the Annual
Inspection/Evaluation Report on or before 15 January 1998. In preparing the
inspection/evaluation report, inspection team members must observe the following:
No more than 25 NSCC service records and/or 15 NLCC
service records need to be inspected for Section B of Part III of the NSCC/NLCC Annual
Inspection/Evaluation Report.
NSCC and NLCC scores will not be
combined in arriving at inspection scores.
NSCC units with affiliate NLCC training ships which
have the same officer staff will prepare a separate report for each. NLCC cadet scores
will not be used in arriving at the final score for the NSCC unit.
Those NLCC companies with less then five cadets on
board do not need to be inspected. NLCC companies with five or more cadets shall be
inspected and an inspection/evaluation report completed. The results of the NLCC
inspection shall be forwarded with the NSCC unit inspection/evaluation report. Only the
NSCC inspection results will be recorded on the NSCC NHQ notice which is published
annually and is used to determine standings for national competition. NLCC companies are
not eligible to compete for national standings with NLCC training ships.
3. Action.
Inspection year. The inspection year is
fiom 1 January through 31 December 1997.
Inspection period. NSCC/NLCC units will
be inspected during the period 1 January through 31 March 1998. If your unit is
being inspected prior to 15 January 1998, please contact NHQ so you can be provided with
Part VII (NHQ Evaluation) scores and grade.
Inspection schedule. Regional Directors
have overall responsibility for scheduling, coordinating, conducting and/or reviewing unit
inspections for NSCC/NLCC units under their cognizance. Where compatible with the regional
schedule, inspection teams will inspect NLCC training ships with their affiliate NSCC
units.
Inspection teams. Regional Directors
will designate inspection team members per reference (a). When possible, the same
inspection team(s) should be used throughout the Regional Directors' region to provide for
consistency. Active duty, reserve, retired and Navy League officials may only participate
as members of the personnel inspection parties. When this procedure is used, the NSCC
regional inspection team shall conduct the remaining sections of the inspection to insure
consistency and fairness in grading. Units not inspected by a designated inspection
team, will not be eligible to compete for national awards.
Inspection dateline. The completed
Annual Inspection/Evaluation Reports must arrive at NHQ no later than 30 April 1998
in order to be eligible for national awards. Regional Directors are directly
responsible for submitting completed inspection reports to NHQ in a timely manner to
ensure they arrive at NHQ by no later than 30 April 1998. Unit commanding
offcers should constantly monitor the status of their inspection/evaluation report to
fUrther ensure it arrives at NHQ on time.
Inspection procedures. Inspections will
be conducted per procedures outlined in the 1997 Annual Inspection/Evaluation Report. In
preparing for the annual inspection and preparing the report, unit commanding officers and
inspection team members must observe the following:
Regional Directors will fill out Part VI prior to the
inspection. Unit commanding officers will fill out the cover page of the
Inspection/Evaluation Report form.
Officer and Cadet worksheets (enclosures (2) and (3))
must be completed prior to commencement of inspection.
NSCC and NLCC scores will not be
combined in arriving at inspection scores. Use separate forms for NSCC and NLCC.
NSCC units with affiliate NLCC training ships which
share the same officer staff will prepare a separate report for each. Sections pertaining
to officers will be included in both reports. NLCC cadet scores will not be
used in arriving at the final score for the NSCC unit.
The Personnel Inspection pertains to those
members of the unit who are enrolled at the time of the inspection. It
is not an inspection of those on board on 31 December 1997. All other sections in
the Inspection/Evaluation Report are based on data obtained from 1 January to 31 December
1997.
Excused absences apply only to unit
"in-house" computation of satisfactory cadet drill attendance.
"Present" or "Absent" ONLY must be used for accounting in
monthly reports and the "Personnel Inspection" section of the Annual
Inspection/Evaluation Report.
The Senior Inspection Officer will enter his or her
comments on the inspection/evaluation report and discuss findings with the unit commanding
officer.
Unit discrepancies discovered during the inspection
and corrected during or after the inspection will not alter the grade assigned for the
discrepancy.
4. Distribution of Annual Inspection/Evaluation
Report.
Upon completion of the inspection, the Senior
Inspection Officer will forward the original inspection/evaluation report to the Regional
Director for comments.
After the Regional Director has completed an overview
of the report and endorses it, he or she will make the following distribution of the
inspection report:
Forward the report to the NSCC Committee Chairperson
for review, comments and endorsement. The President of the Council can sign for the
Chairperson. After council endorsement, the report shall be returned to the Regional
Director for forwarding to NHQ. If council does not return the inspection report after two
weeks, the Regional Director shall annotate a copy of the report as such and forward the
copy to NHQ.
After council endorsement, forward one complete copy
of the completed Inspection/Evaluation Report to the unit commanding officer.
Provide the NSCC field representative with a copy.
| NOTE: |
1) DO NOT submit officer and cadet
worksheets. They are to be retained by the unit commanding officer for his or her records.
2) Unit commanding officers are requested to assist Regional Directors in producing copies
of their inspection report. |
5. National competition.
NHQ determines national ranking on the basis of final grades and cadet enrollments for
each unit. The following minimum requirements must be met in order to be eligible for
national competition:
The Annual Inspection/Evaluation Report must arrive
at NHQ on or before 30 April 1998. Due to the summer training workload,
Inspection Reports submitted after 30 April 1997 will be recorded as time permits and will
not be considered for national competition.
NSCC units must have a minimum of 25 NSCC
cadets enrolled by 31 December 1997.
NLCC training ships must have a minimum of 15
NLCC cadets enrolled by 31 December 1997.
The NSC-11,
Budget-Audit Report (enclosure (4), must accompany the Inspection/Evaluation Report in
order for the inspection report to be considered complete. The Budget-Audit Report is
absolutely essential for a complete inspection whether or not your unit is eligible for
national competition.
NOTE: There are no awards for NLCC companies.
6. Cancellation. This Action Letter will
be canceled on 1 June 1998.

M. D. FORD
Distribution: National Chairperson (w/o encl) (1)
National President (w/o encl) (1)
NSCC Committee Chairman (1)
NSCC Headquarters Representatives (1)
NSCC/NLCC Regional/Associate Regional Director (1)
NSCC/NLCC Unit Commanding Officers (3) |